🚀 Official Launch: The first 50 contractors this October get 25% off Pro and Enterprise tiers! Use code LAUNCH25 at checkout.

VigilDocs
Product showcase

Enterprise-Grade Compliance, Ready in Seconds.

See exactly what VigilDocs generates for your site.

01

Risk Assessment (RA)

Hazards are deduced from your task description and scored on the standard 5x5 matrix, with dynamic control measures, residual ratings and PPE assigned automatically.

Example risk assessment with a 5x5 risk matrix generated by VigilDocs
02

Method Statement (MS)

A clear, chronological sequence of works — permits, setup, task steps and sign-off — broken into 11 auditable stages your operatives can actually follow on site.

Example method statement showing a numbered sequence of works
03

Construction Phase Plan (CPP)

Every plan follows the full 11-section CDM 2015 structure — project details, management arrangements, emergency protocols and welfare provisions — laid out for Principal Contractor review.

Example Construction Phase Plan document generated by VigilDocs
04

Command Center Dashboard

Real-time project, fleet and asset tracking in one place — compliance status, document output and inspection health at a glance.

The VigilDocs command center dashboard with project and fleet tracking
05

Toolbox Talks

Actionable, step-by-step safety briefings on any topic, each with a digital sign-on-glass attendance register so every signature is captured on site.

Example toolbox talk briefing sheet with attendance signatures

Ready to cut your paperwork in half?

Describe the job. Get a full CDM-compliant safety pack — RAMS, CPPs, Toolbox Talks and more — in minutes, not evenings.

No app download. Works in any browser — on site or in the office.